Grand Pioneer

U-Ming’s Grand Pioneer, a 325,000 DWT VLOC, was successfully installed with four 5x35m Folding Rotor Sails from Anemoi Marine Technologies Ltd (“Anemoi”) in September 2025. 

Overview

  • 325,000 DWT, VLOC 
  • Installation Yard: COSCO SHIPPING Heavy Industry (Zhoushan) Co., Ltd. 
  • Class: DNV
  • Client: U-Ming
  • Charterer: Vale
  • Delivered in September 2025

Approach

  • 4 Rotor Sails (5m x 35m) were installed 
  • The Rotor Sails were installed on Anemoi’s bespoke folding deployment system, whereby the sails can be folded from the vertical to mitigate impact on air draught and cargo handling operations when in port. 
  • Mobilisation of global supply chain and full stakeholder engagement, including management of the Class approval process 
  • Rotor Sails were successfully installed; installation of equipment including commissioning took 22 days. Commissioning of Rotor Sails took 4 days, one day per Rotor Sail. 
  • All Rotor Sails are automated and controlled from the Bridge Control Unit (BCU)
  • Annual reduction in fuel consumption and emissions is expected to be around 12%
The installation of Rotor Sails on Grand Pioneer marks an important step in U-Ming’s decarbonisation journey and reflects our belief that the future of global shipping must be both sustainable and competitive. Through the collaboration with our forward-thinking partner Anemoi, we are turning strategy into action by reducing emissions, enhancing efficiency, and delivering long-term value. This initiative also demonstrates our commitment to innovation and our contribution to the industry’s shared ambition of achieving net zero by 2050.  
Mr Jeff Hsu
Vice Chairman of U-Ming